Sarawak has over 300 rural schools deep in its rainforest. Most of the rural schools are situated either along rivers or nestled in the mountainous regions of rural Sarawak. For over half a century, these schools have relied on diesel generators to power the facilities for both students and teachers. Sarawak remains the last of the states in Malaysia, that have not substituted its diesel generators with solar generation.


Sekolah Menengah Kebangsaan Bario






School Details

School Name: Sekolah Menengah Kebangsaan Bario

School Code: YEB4303

Address: Dataran Tinggi Kelabit,Bario 98050 Marudi Sarawak

School Population:152 Students / 15 Teachers

Distance to Town:-






Clean Solar Energy Values


Traditional electricity sources that are relatively using fossil energy resources will not be able to address supply and demand in rural areas which are scattered over huge geographic distances. Solar power is one of solutions for those problems concerning environmental impact and emissions. Solar power is pollution free and causes no greenhouse gases to be emitted after installation.

Annual Power Generated


56575
(kWh)

The amount of power able to be generated using the solar hybrid solution for the school.



Equivalency of Carbon Sequestered

1971
(Trees)

To be measured in how many trees are saved to generate more oxygen in the area; as opposed to harmful diesel generator fumes and exhaust as well as discharge.


CO2 Emission Reduction


76041.67
(Metric Tonne)

The amount of Carbon emissions managed to be reduced in and around the school once the Solar Hybrid generation takes over.




Milestone Project Status


Our milestones are powerful components in project management because they show key events and map forward movement in the project plan. That is why it is important to list these deliverables as project milestones, this will enable everyone to monitor our progress and be aware of any obstacles faced throughout the project delivery.


Milestone 1 (Details) Completed

Milestone 2 (Details) Completed   Pending



Milestone 3 (Details) Completed     Pending



Click Here

Milestone 4 (Details) Completed   Pending




Product Information


QEOS Energy provides affordable, long lasting and clean solar energy technologies which have huge longer-term benefits. Specially designed for rural application, our technology will be able to withstand challenges from the equatorial environment.



QEOS Storage Model


156 (kWh)

The amount of power produced by solar panels once the Solar Hybrid generation takes over.


QEOS Solar Installation


142(kWp)

The amount of power that solar panels generate under standard conditions.





How It Works


QEOS Hybrid Solar Solution can provide a stable, low-cost, long-lasting solar solution and can generate excess power. This will allow power generation in a school that has never experienced a fixed power supply. Most importantly, it is designed to be distributed off-grid, so a billion dollar power plant is not needed to power up a school.







Location